Qualified restoration
A suitable roof can receive cleaning, preparation, detail repairs, specified primer and coating as one system.

Choose restoration only after the existing roof qualifies for a new surface.
Free roof inspections. Clear repair and replacement options.
A coating can renew a qualifying roof surface, but suitability comes from the existing assembly. The substrate needs to be sound, appropriately dry and compatible with the selected coating and preparation. Adhesion, seams, penetrations and drainage need assessment before a surface is covered.
Wet insulation, unstable material or unresolved structural and drainage problems need corrections of their own. A fresh coating over them can hide the condition while leaving the cause in place.

Match the work to the system and the condition beneath it.
A suitable roof can receive cleaning, preparation, detail repairs, specified primer and coating as one system.
Seams, flashings and localized defects need preparation and compatible repair before the field treatment is applied.
Extensive wet layers, unsound substrates or an exhausted assembly can make tear-off and replacement the more useful scope.
Identify the existing materials, moisture, adhesion and drainage conditions.
Cleaning, detail work and any specified primer establish the surface for the system.
The coating specification and curing conditions govern installation; equipment-service routes need consideration.
Roof area, surface preparation, detail repairs, product system and application requirements change restoration cost. Moisture correction and drainage work are separate from the coating quantity. Actual warranty terms depend on the issuer and specified system.
Tell us the building use, the roof concern and any access restrictions you already know. The free inspection starts with that information and the current roof.
Review commercial roofing options
It is restoration of a qualifying existing surface. It does not remove and rebuild unsuitable underlying layers, so the existing assembly must be assessed first.
Building use, entrances, loading and equipment access belong in the project discussion. The actual scope and conditions determine staging and schedule.

Describe the roof concern and how the building is used. Request a free roof inspection.
(816) 330-2235